Arc flash assessment, hazard study and short circuit fault current calculation  
  Short Circuit Analysis
  Expert Advice for
Arc Flash Analysis
 
   Home
 
  SHORT CIRCUITS:
   Calculator
   Reference Data
 
  ARC FLASH:
AFA v3.0
   NFPA 70E Calc
   IEEE 1584 Calc
   Tool Overview
 
  Transfer Switches
 
   Info / FAQ
   Examples
 
  Blog
   Contact Us
   Testimonials
   Terms of Use
   News & Links
   Site Map

national-safety.net
advertise with us

Advertise
with ArcAd


Username:
Password:
Don't have an account? Please Sign up. Registration fee applies.
 
A Handbook to Accompany the Online Short-Circuit Calculation Program
 

Annotation: This program, other programs, or hand calculation can be used to perform short-circuit calculations. Any method used requires specific data on the power distribution system. All this data is converted to short circuit MVA values (SC MVA) for each component in the system. This paper describes the data needed for each type of circuit component and how to obtain the data. It also describes method and advantages of using the online short circuit program to calculate available short-circuit currents.


Purchase Arc Flash Analytic v3.0 on CD or electronically and get one month use of the ArcAd Online Short Circuit Calculator for free

arc flash analytic


Steps of performing short circuit analysis:

1. 

Create an account if you don't already have one, and log onto the page where you can add components one by one to build up a radial electrical distribution system. The components can be a power source, transformers, bus ducts, cables, motors and generators, or "special" components whereby the user can define his own X and R values for a non-standard device.

2. Build a one line diagram of distribution system [example].
3.

Pre-assign each basic component within the industrial electrical distribution system a single short circuit MVA factor (SC MVA) based on the impedance it adds to the system, and X/R ratio [more...].

4.

Develop a hierarchical tree in terms of database records [more...]

5.

Now, as you have all the required data on hand, program in your power distribution system. When finished, click Display button to calculate symmetrical 3 phase bolted fault short circuit MVA from the data compiled in steps 1 to 4.

Arc Flash Study &
Labels per NFPA 70E

Electric arc flash calculator

AFA V3.0 , V2.0

Arc Flash Label
Printing Services

Label Printing Services
Generator Transfer Switch

Generator
Transfer Switches

Write us at: